Brody Forbes carried out a 2 yearly inspection of a steel and GRP hybrid tower for Enerveo Ltd.
The tower was originally strengthened as part of the project Marshall in 2017. The inspection involved carrying out tension testing of the guyed cables using a digital tension meter.